logo
  • 7 block 1185 mokrr sheraton house - Cairo - egypt

  • (0111) 6001020

Gallery

Operation of the water purification plant Tenth of Ramadan

Operation and maintenance of water purification station guard (2) and turbid station No. (2) new Tenth of Ramadan City
City X. start contract 12/2007
Design capacity of 4000 l / s
Turbid water components (2) new
Number 6 electromotor Ras Siemens capacity of 900 k. / 11 kV. P lifting device provider Persians 56 amp works automatically and the number 6 Stars 6 ksb disposal pumps 1000 l / s at raising 65 meters moored contents and Mhabsaa tank capacity (45,000) m